Installation procedure of workshop isolation net.

As the main melody of modern enterprise production, safety has been paid more and more attention. In view of the present production status, all kinds of safety measures take the field. Workshop isolation network supplied by double wire mesh fencing supplier, its installation is one of them, the following small make up to discuss the advantages of workshop isolation network installation and detailed steps, hope to help you.

The advantage of workshop isolation network installation is to be able to play a protective role, it has a very small area, so that the corresponding effective space can be increased, workshop isolation network has a good light transmittance so the auxiliary requirements for lighting are not high. The specific advantages are as follows:

1. Novel structure in appearance.

2. The stability of the whole facility cannot be underestimated.

3. Parts with advanced anti-rust treatment can increase the service life.

4. It can be maintained without maintenance, and fading of appearance is rare.

There is a great demand for modern chemical enterprises and corresponding industrial sites.

6. Simpler installation and relatively lower cost.

double wire mesh fencing supplier

Double wire mesh fencing supplier

Installation steps of workshop isolation network:

Relative to the Welded Wire Mesh Fence Panels installation steps are relatively simple, and road isolation belt is similar, but its main role is still a certain difference. The requirements for isolated areas are not the same. Detailed steps are as follows:

The first step is to determine the location of the installation: this step requires the determination of the location of the installation, the design needs to pay attention to the scope of the isolation zone, and the associated risk level. When everything is decided, the relevant design drawing and detailed installation list need to be made, and then the material preparation should be carried out according to the list.

The second step is to lay the foundation: according to the area involved in the drawing, make the foundation of the workshop isolation net column, and arrange and fix the relevant embedded parts.

The third step is installation: in this step we need to install the workshop isolation network. First, the embedded parts are connected with the column by fixed screws. When everything is installed, check for security and stability.

The fourth step is to check and accept the installation of the welded fence for sale that has been installed. Here, it is to check the stability and safety according to the design requirements of the drawings to ensure the normal. By this time the relevant facilities have been installed.